The Santa Barbara estate dry bar demonstrates why a design-build approach matters for projects with irreplaceable imported materials. Builder John McDonough — now with Kingdom & Co. — coordinated international shipments of French porcelain and Moroccan tile panels, aligning fabrication timelines, customs logistics, and on-site readiness so materials arrived when the space was prepared to receive them. Because materials like the porcelain countertops cannot be cut or modified after fabrication, the build team had to get measurements right the first time during construction. A design-build firm that manages both design decisions and construction execution under one contract eliminates the communication gaps that could lead to costly errors with one-of-a-kind materials.


