A custom home with a basement in Las Vegas typically takes longer than a standard build due to the excavation challenges presented by caliche and the additional structural work involved. The Emberlyn Estate, a 7,500-square-foot home with a full basement, was completed in approximately 20 months from groundbreaking to final walkthrough.