A Custom-tier whole-home remodel in Las Vegas typically takes 8 to 14 months from the start of design through final walk-through, depending on scope, material lead times, and permit timing. The design phase alone runs 2 to 4 months for a project like the Ashford, followed by permitting (30 to 90 days in Clark County), then 5 to 9 months of construction. Kingdom & Co. develops a detailed schedule during the design phase so clients know what to expect at each stage, and the design-build model shortens the total timeline compared to a design-bid-build project because there are no handoffs between separate architect, designer, and general contractor firms.
By Kingdom & Co.|2026-10-06T10:55:40-07:00September 29, 2026|The Ashford: A Willows Summerlin Home Renovation That Brought a Family Back Together|Comments Off on How long does a whole-home remodel take in Las Vegas?
About the Author: Kingdom & Co.
Kingdom & Co. is an award-winning luxury design-build firm in Las Vegas, handling custom homes, whole-home remodels, casitas, and focused single-room Small Luxuries projects under one roof. The team brings a collective 30 years of design and construction experience and is a back-to-back NARI Remodeler of the Year winner (2025 and 2026), an Architectural Digest AD Pro Directory member, and a 2025 Best of Las Vegas Gold winner for Best Custom Home Builder. Kingdom & Co. holds Nevada contractor licenses #0091618 and #0091629 and maintains an A+ rating with the Better Business Bureau. Learn more about the team at kingdomandco.com/about-us.