Whole-home remodels typically run 10 to 18 months from signed contract to move-in. Design and permitting take 3 to 5 months; construction runs 7 to 12 months depending on scope, material lead times, and jurisdiction. Single-space remodels (kitchen only, primary bathroom only) typically run 5 to 9 months.