A Custom-tier whole-home remodel in Las Vegas typically takes 8 to 14 months from the start of design through final walk-through, depending on scope, material lead times, and permit timing. The design phase alone runs 2 to 4 months for a project like the Ashford, followed by permitting (30 to 90 days in Clark County), then 5 to 9 months of construction. Kingdom & Co. develops a detailed schedule during the design phase so clients know what to expect at each stage, and the design-build model shortens the total timeline compared to a design-bid-build project because there are no handoffs between separate architect, designer, and general contractor firms.