Potential disadvantages of design-build include: (1) less design competition because the client is not bidding the design out to multiple firms, (2) potential for reduced client control if the design-build firm’s process is not transparent, and (3) fewer independent checks on design decisions since the same firm is designing and building. These are mitigated by choosing a design-build firm with a transparent design phase, documented project process, and strong client references.