Research from the Construction Industry Institute and the Charles Pankow Foundation 2018 study found design-build projects had 6 percent lower unit costs than design-bid-build projects. The savings come from fewer change orders, better cost predictability throughout the design phase, and reduced overhead from managing multiple contracts. Design-build is not always the lowest bid on any single project, but it consistently delivers better cost outcomes across a portfolio of projects.