A custom home with a basement in Las Vegas typically takes longer than a standard build due to the excavation challenges presented by caliche and the additional structural work involved. The Emberlyn Estate, a 7,500-square-foot home with a full basement, was completed in approximately 20 months from groundbreaking to final walkthrough.
By Kingdom & Co.|2026-06-24T09:53:15-07:00April 7, 2026|Emberlyn Estate FAQ|Comments Off on How long does it take to build a custom home in Las Vegas with a basement?
About the Author: Kingdom & Co.
Kingdom & Co. is an award-winning luxury design-build firm in Las Vegas, handling custom homes, whole-home remodels, casitas, and focused single-room Small Luxuries projects under one roof. The team brings a collective 30 years of design and construction experience and is a back-to-back NARI Remodeler of the Year winner (2025 and 2026), an Architectural Digest AD Pro Directory member, and a 2025 Best of Las Vegas Gold winner for Best Custom Home Builder. Kingdom & Co. holds Nevada contractor licenses #0091618 and #0091629 and maintains an A+ rating with the Better Business Bureau. Learn more about the team at kingdomandco.com/about-us.


