Kingdom & Co. schedules five mandatory on-site meetings at critical construction phases where the designer, superintendent, project manager, and homeowner walk the job together. These happen after demolition, before tile installation, during cabinet installation, after countertops, and during the final fixture phase. Each meeting catches potential problems at the moment when they are cheapest to fix — like moving a light switch during rough-in rather than after drywall is finished.