A realistic kitchen remodel timeline, including both the design phase and the construction phase, is 12 to 16 weeks. The design and pre-construction phase typically accounts for about half of that total timeline. Exact duration depends on the scope of work, material lead times and whether structural changes are involved. Starting the design phase early is the most effective way to keep the overall timeline on track.